Projects
×

Employee Login


Login

Survey

We provide effective survey expertise.

We have carried out topographical survey, geo- technical studies, geometric design, structural hydrological design & other preliminary activities in connection with construction of new BG line between Udhana to Jalgaon (306.93 km) for Western Railway, Mumbal division. The project includes design of 5/7 Major and 308 Minor Bridges, GDRPL has also prepared yard plans and index plans for the complete project having total worth of 1257 Cr.

2000+
KM Road Survey
300+
Nos. Bridge/ROB Survey
10000+
Acres Catchment Survey
700+
KM Rail Survey
300+
KM Pipeline Survey

Mobile Lidar Survey

The data can be capture maximum speed of 35 km per hour. In average of 100 to 150Km/per day for Existing Two Lane Road and 75-125 km/per day .


Drone Survey

Drone survey is carried out aircraft without a human pilot, It is controlled autonomously by computer or remote control of personnel on ground. It can be cover 15 to 500 Acre per day. It can cover very large area with very high accuracy.


Projects

Detailed Project Report for ROB at various locations on Mumbai – Delhi route between Ahmedabad to Palanpur, Gujarat

Client: Roads & Buildings Department (R & B)

Nos. of ROB: 19

Development of NH 8C (New NH 147) passing through Chiloda – Gandhinagar –Sarkhej, Gujarat

Client: National Highway, Ahmedabad

Underpass/ VUP/ Fly over Bridge: 8 No. Flyovers New Construction, 2 No. VUP New Construction 2 No. Flyovers to be retained, 2 No. Underpass to be retained,

Elevated Highway: 1 No. New Construction of 4 km

Carrying out location Survey, Geotechnical studied, preparation of design & drawing and other preliminary activities in connection with construction of new BG line between Udhana to Jalgaon section of Mumbai division

Client: Western Railway

306.93 km Broad gauge line between Udhana to jalgaon

Consultancy services for Final location survey for doubling, marking of alignment based on collected survey details & reparation of land proposals as per land acquisition if required, Hydraulic calculation of major bridges, soil exploration and other miscellaneous works and L – section of new line parallel to existing track between Viramgam- Samakhiyali in connection with VIRAMGAM – SAMAKHIYALI Doubling Project.

Client: Western Railway Ahmedabad

Doubling project, Length of Bridge : 1409.1 Mtr, PSC Girder

Consultancy services for preparing gads for bridges, detailed design & drawings and other allied work as per schedule in connection with proposed doubling of existing railway line between katni – singrauli 261 km long of west central railway.

Client: Western Central Railway

Katni – Singrauli Doubling Project ( Jabalpur -M.P. )

Consultancy services for preparing general arrangement drawings, detailed design & drawings for viaduct, minor bridges, box culverts in railway alignment and road over bridges on road crossings, and other allied consultancy works as per schedule in connection with the construction of a new dual gauge agartala - akhaura rail link project.

Rail Link: Agartala to Akhaura

Total Length:15.064 KM

Length in India:5.050 Km

Length in Bangladesh:10.014 Km

Consultancy Services for Technical Feasibility study and Detailed Project Report for gauge conversion project between Katosan road – Becharaji – Chanasna – Ranuj (65 Km) line of Ahmedabad division of Western Railway in the state of Gujarat.

Major Activities: Geometric Design, Track Design, Structure Design, Quality and cost Estimate, Financial Analysis

Consultancy services for Final location survey including soil exploration, Hydraulic data collection and calculation for minor and major bridges, fixing of alignment based on survey and available survey records, preparation of land records as per land acquisitions, preparation of L-sections and design and drawing of bridges for Gauge conversion MG to BG between Mehesana-Taranga Hill stations in connection with Bhildi-Viramgam new material modification.

Client: Western Railway Mumbai

Conducting Geo Technical Study by soil exploration with bore holes and submitting test reports, Preparation and submission of LWR plans etc for doubling project between SURENDRANAGAR – RAJKOT stations in connection with doubling of surendranagar- Rajkot Station.

Client: Western Railway Ahmedabad

Detailed Project Report for ROB in lieu of LC – 77 between Bhilad to Vapi, Gujarat

Client: Roads &Buildings Department (R & B)

Salient Feature: Trumpet Interchange

Detailed Project Report for construction of a bridge across river Kaveri on Bilimora – Vaghrech – Bigri – Dholai port (Coastal Highway), Navsari

Client: Roads &Buildings Department (R & B)

Span: 10 Nos. of 35m PSC I-Girder

Execution of Geotechnical investigation work and preparation of Design & Drawing for construction of RoB in Bijuri yard, Bilaspur, Chhattisagarh

Client: South East Central Railway (Govt. of India)

Detailed Project Report for construction of new four lane Bridge (2 Nos.) and reconstruction of Bridge (1 No) on Surat Olpad Road, Surat

Client: Roads &Buildings Department (R & B)


All Expertise